The Impact

Over the past 2 years, Tidhar has deployed Wint at over 40 construction projects. These include residential highrise buildings as well as large, million-square-feet high-tech commercial facilities. Over this 2-year period, Tidhar experienced 6 shutoff incidents across its portfolio, with water flow rates of 400 – 2000 liters per hour (100-500 GPH). Incident causes included a defective fitting, a broken hose and a tap mistakenly left open.

In all incidents, Wint identified the issue, shut water off and alerted staff, saving the sites from massive damage and delays. Since deploying Wint, Tidhar has not suffered a single water damage incident. In fact, the company has established Wint as a mandatory standard for all of its construction projects; any deviation from its inclusion requires formal CEO approval.

Since installing Wint, no damaging leaks have ever occurred at Tidhar’s construction sites.